- Three WTPs with huge annual consumption are selected for Solar PV installation project.
- Annual savings of PHE/UMC estimated: 3.0 Cr per year.
- The life of this projects is : 25 years
- MPUVNL is implementing setting up PV solar panels at 3 sites with total capacity of 1.29 MW.
- Capex model awarded for a period of 5 yrs.
- Total electricity generated till date: 27.30 lac unit
- Total rebate received till date: Rs. 1.50 cr.
- Undasa Plant – 100 Kwh
- Gaughat Plant – 550 Kwh
- Ambodia Water treatment Plant – 640 Kwh