Departments Categories: Under Implementation

14 Dec
By: USCL 0

Other Temple Plaza Infrastructure Improvement

Infrastructure Improvement at Kaal Bhairav & Sidhhavat Temple

• Parking Area Development and Renovation of Approach Road
• Viewing Deck with Selfie Point Watchtower
• Renovation of Existing Ghats
• Cleaning Beautification of Riverbank
• Public amenities Shoe Stand Drinking Water Station
• Entrance Plaza landscape design with resting structures
• Extension of ghats renovation of existing rituals shed area
• New parking area development with public utilities facilities

[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
14 Dec
By: USCL 0

Mrida Phase2

MRIDA Phase- II has been approved under CITIIS (Cities Investment to Innovate, Integrate and Sustain) program of GoI for funding from AFD (French Development Agency) and EU (European Union)

Project Components:

  • Development of Maharajwada complex as Heritage Dharamshala
  • Rejuvenation of Rudrasagar lake and Lakefront development at Chhota Rudrasagar
  • Revitalisation of Ram ghat facade
  • Development of Basement Parking and Hawkers zone at existing Maharajwada II and Urdu school premise along with Police Thana
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
14 Dec
By: USCL 0

R-18 BegumBaag Smart Roard

COMPONENTS

  • Construction of New Storm water drain.
  • Construction of smart road with underground utilities i.e. water supply line, gas line, OFC, electrical lines etc.
  • Provision of new Administrative Building.
  • Construction of entrance gate reflecting importance of Mahakal corridor.
  • Provision of boundary wall with murals on cultural theme.

BENEFITS

  • Provide connectivity from Begum Bagh road to Mahakal corridor.
  • Ease of access to Shri Mahakaleshwar Temple via Mahakal corridor.
  • Smart road with underground utilities with a direct way to reach facility center of Mahakal corridor..
  • Create a more space to cater the pilgrims during festive seasons.
  • Provide greater landscaping and work along the road and create a great feelings for the pilgrims.
  • Provide pedestrian way on both sides of the carriage way.
  • A precious entrance gate to Create awareness on the significance of the cultural heritage in Ujjain & Creation of historic landmark.
Read More
14 Dec
By: USCL 0

Well and Step Renovation

List of Wells and Bawdis Renovated by Smart City:
1. Mahavir Bawdi (Pipli Naka)
2. Tilakeshwar Temple Stepwell
3. Modi ka Chopra Stepwell
4. Maharani Bawdi of Nagar Kot
5. Pushkar Bawdi etc

Read More
14 Dec
By: USCL 0

Surface Parking

Ujjain is a historical and religious city. A large number of devotees and tourists visit here. One of the 12 Jyotirlingas of India, Jyotirlinga Shri Mahakaleshwar is located in the city of Ujjain. Shri Mahakaleshwar Temple is visited by lakhs of devotees, and the parking arrangement is very inconvenient. The project is proposed to be constructed in an area of ​​15243 square meters, out of which car space is to be constructed in 14373 square meters, multipurpose hall in 370 square meters and e-rickshaw deck in 500 square meters. According to the category of each vehicle under the Surface Parking Project, the location and limits of the vehicle have been marked and the provision of sign boards and guidelines is also proposed for the guidance of tourists.

[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
14 Dec
By: USCL 0

Swimming Pool Phase 2

Swimming Pool Complex Phase II comprise of
•Olympic Standard Diving Pool, Leisure Pool
•Gymnasium, Steam bath, Jacuzzi
•Clubhouse with Accommodation
•Visitor’s Plaza, Restaurant
•Skating Rink, Tennis courts, Badminton
Court, Box Cricket
•Indoor Games

[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More