Departments Categories: Under Implementation

15 Dec
By: USCL 0

3D 4K Auditorium at MPCST Planetarium

Upgradation of MPCST Planetarium with 3D/4K Projection System

Upgradation of existing building like:

  • Renovation of dome
  • Water proofing
  • False Ceiling repair
  • Toilet repair work
  • Flooring
  • Façade treatment with glass work
  • Ticket counter repair
  • New reception counter
  • ICT component for installation of 3D projection system with 4K resolution
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Vikram University

Vikram University Museum Renovation Development Works

  • Ticket counter, information center, offices and library to be accommodated/ designed.
  • Display of collections and Interpretation of temple architecture of Parampara timer period, exhibition panels, models etc.
  • Creating RCC columns at necessary intervals for supporting existing walls and additional floor is proposed for the display of collections.
  • Controlled air-conditioned environment for the display/curation in galleries.
  • Lighting and illumination for respective galleries as per the designed theme
  • The double height space of the central gallery has potential to show magnificence of the building.
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Mahakaal temple approach roads

Development of Mahakaal temple approach roads

  • The major approach roads to Shree Mahakaleshwar temple are proposed to be widened and new road is also proposed to be constructed
  • Realignment of road is also proposed

Proposed widening and new roads

  1. New road from Narsingh ghat to Nutan school (15 m)
  2. Bada Ganesh mandir road (18 m)
  3. Mahakaal Chouraha to Mahakaal Mandir (24 m)
  4. Saraswati Shishu Mandir to Ahilya Bai Marg (15 m)
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Light and Sound Shows

Light and Sound Shows, Water Screen based Projection Mapping System at MRIDA 1 Components and Rudra Sagar

  • State of the art musical light and sound show is proposed in the Rudrasagar lake and on the sculptures being constructed under MRIDA phase I project
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Pedestrian bridge on Rudrasagar lake

Pedestrian bridge on Rudrasagar lake

  • Pedestrian bridge with arches and pier proposed on Rudrasagar lake
  • Bridge will be 6 m wide and 200 m in span
  • Bridge will have a 17 m wide deck area in center for light & sound show
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Neelkanth Van

Landscape area development at Neelkanth Van

  • Landscape area development on the sloped land
  • Water body with Shiv sculpture
  • Entry through ramp to basement parking
  • Shops and sitting area
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Smart Roads – Package 3A Under Revision – R22/R25

Underground Utility Ducting with Smart Roads – Package 3A Under Revision for #R22/R25

  • 24Mts. Wide Non Motorised road with the following features:
  • 3Mts. Wide Cycle Track
  • 9Mts. Wide E-Rickshaw Lane
  • 1.7 Mts Wide Tree Lane
  • 6 Mts. Wide Pedestrian lane
  • 4 Mts. Wide Sitting area
  • Smart Road with all underground services like Storm water drain, sewerage, Gas pipeline, LT & HT Chamber, OFC Chamber.
  • Chhatriya overlooking the Rudrasagar Lake
  • Sculptures in Sitting lane on the concept of Panchtatva.
  • Shops, Public Utilities, Plaza and Kids play area near Bridge landing area.
  • Smart pedestrian friendly road connecting Mahakal mandir.
[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Development of Meghdoot Van

Land is proposed to be developed as an Urban forest, parking for high footfall days of temple, shops and buildings for government offices.

[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
15 Dec
By: USCL 0

Emergency Entry Exit

Emergency entry and exit routes are proposed to be constructed by removing Dewas Dharamshala in the west of Mahakal temple.

[lvca_heading style=”style3″ align=”left” animation=”fadeIn” heading=”Photo Gallery”]
Read More
14 Dec
By: USCL 0

Intersection Improvement

Improvement of 12 major intersections of the city

Following are the interventions proposed:

  • Road Median correction and realignment,
  • Pedestrian friendly crossing and zebra marking,
  • Stop line for traffic light, Road marking and lane marking
  • Appropriate footpath construction,
  • Correction of Roundabout if present
  • Splitter for free left turn
Read More