Emergency entry and exit routes are proposed to be constructed by removing Dewas Dharamshala in the west of Mahakal temple.
15 Dec
14 Dec
By: USCL
24×7 Water supply in ABD Area
Retrofitting of water supply pipeline
•Development of 9 over head water tanks
•Allied infrastructure
•Being developed by UMC, funded by UMC and USCL
Photo Gallery
14 Dec
By: USCL
Intersection Improvement
Improvement of 12 major intersections of the city
Following are the interventions proposed:
- Road Median correction and realignment,
- Pedestrian friendly crossing and zebra marking,
- Stop line for traffic light, Road marking and lane marking
- Appropriate footpath construction,
- Correction of Roundabout if present
- Splitter for free left turn
14 Dec
By: USCL
Cycle Track
• 1.7 km long track around an existing sports arena.
• Cold Thermoplastic Paint having excellent adhesion, anti skid, water absorbing properties used for cycle track.
• Solar streetlights for providing a reliable source of continuous lighting, hence increasing safety.
• Raised/ Tabletop pedestrian and cyclist crossings for increased safety.
• Flowering planters/ trees along the tracks.
Photo Gallery
14 Dec
By: USCL
Other Temple Plaza Infrastructure Improvement
Infrastructure Improvement at Kaal Bhairav & Sidhhavat Temple
• Parking Area Development and Renovation of Approach Road
• Viewing Deck with Selfie Point Watchtower
• Renovation of Existing Ghats
• Cleaning Beautification of Riverbank
• Public amenities Shoe Stand Drinking Water Station
• Entrance Plaza landscape design with resting structures
• Extension of ghats renovation of existing rituals shed area
• New parking area development with public utilities facilities
Photo Gallery
14 Dec
By: USCL
Mrida Phase2
MRIDA Phase- II has been approved under CITIIS (Cities Investment to Innovate, Integrate and Sustain) program of GoI for funding from AFD (French Development Agency) and EU (European Union)
Project Components:
- Development of Maharajwada complex as Heritage Dharamshala
- Rejuvenation of Rudrasagar lake and Lakefront development at Chhota Rudrasagar
- Revitalisation of Ram ghat facade
- Development of Basement Parking and Hawkers zone at existing Maharajwada II and Urdu school premise along with Police Thana
Photo Gallery
14 Dec
By: USCL
R-18 BegumBaag Smart Roard
COMPONENTS
- Construction of New Storm water drain.
- Construction of smart road with underground utilities i.e. water supply line, gas line, OFC, electrical lines etc.
- Provision of new Administrative Building.
- Construction of entrance gate reflecting importance of Mahakal corridor.
- Provision of boundary wall with murals on cultural theme.
BENEFITS
- Provide connectivity from Begum Bagh road to Mahakal corridor.
- Ease of access to Shri Mahakaleshwar Temple via Mahakal corridor.
- Smart road with underground utilities with a direct way to reach facility center of Mahakal corridor..
- Create a more space to cater the pilgrims during festive seasons.
- Provide greater landscaping and work along the road and create a great feelings for the pilgrims.
- Provide pedestrian way on both sides of the carriage way.
- A precious entrance gate to Create awareness on the significance of the cultural heritage in Ujjain & Creation of historic landmark.
Photo Gallery
14 Dec
By: USCL
Well and Step Renovation
List of Wells and Bawdis Renovated by Smart City:
1. Mahavir Bawdi (Pipli Naka)
2. Tilakeshwar Temple Stepwell
3. Modi ka Chopra Stepwell
4. Maharani Bawdi of Nagar Kot
5. Pushkar Bawdi etc
Photo Gallery
14 Dec
By: USCL
Surface Parking
Ujjain is a historical and religious city. A large number of devotees and tourists visit here. One of the 12 Jyotirlingas of India, Jyotirlinga Shri Mahakaleshwar is located in the city of Ujjain. Shri Mahakaleshwar Temple is visited by lakhs of devotees, and the parking arrangement is very inconvenient. The project is proposed to be constructed in an area of 15243 square meters, out of which car space is to be constructed in 14373 square meters, multipurpose hall in 370 square meters and e-rickshaw deck in 500 square meters. According to the category of each vehicle under the Surface Parking Project, the location and limits of the vehicle have been marked and the provision of sign boards and guidelines is also proposed for the guidance of tourists.
Photo Gallery
14 Dec
By: USCL
Swimming Pool Phase 2
Swimming Pool Complex Phase II comprise of
•Olympic Standard Diving Pool, Leisure Pool
•Gymnasium, Steam bath, Jacuzzi
•Clubhouse with Accommodation
•Visitor’s Plaza, Restaurant
•Skating Rink, Tennis courts, Badminton
Court, Box Cricket
•Indoor Games